Now
September 2026.
Building
- Sadyr's booking step. Visitors who qualify now see real open slots from HubSpot Meetings on Adroit's live site. The first real booking is waiting on a CRM permission fix. Lead alerts to Slack are running in test-channel mode.
- Content Ops 5.12. Approved documents now carry their page address through to Sadyr, so Sadyr's answers can link to the page they came from.
- This site. Rebuilt from a 2024 résumé into the permanent home for what I'm building.
Shipping on LinkedIn
Four posts a week, Tuesday to Friday. 32 are drafted and queued through the end of November, most waiting on a line or two in my own words before they go out. Long-form versions land in Writing, often before the post runs.
Testing
- The game, on a controller. The playable build is under playtest, and the current work is cleanup and truthful tests, not new content.
- Sadyr, with a headless evaluation battery: 45 recorded runs so far.